ImageExtra-Terrestrial Architecture - NXT BLD London, June 2019

Image The future of digital fabrication - NXT BLD London, June 2019

Image Accelerating design decisions with rapid visualisation - NXT BLD London, June 2019

Image What if human-like mobility could be added to automation on construction sites? - NXT BLD London, June 2019

Image Addressing the increasingly urgent requirement of decreasing embodied energy and waste in construction - NXT BLD London, June 2019

Image The impact of automated web VR workflows and streamlined collaboration - NXT BLD London, June 2019

Image Exploring forms through Computational Design to Digital Fabrication - NXT BLD London, June 2019

Image Getting it real: AEC workflows real-time, real fast and ray traced - NXT BLD London, June 2019

Image Dialogue between architecture and robotic construction - NXT BLD London, June 2019

Image Silicon and Sawdust – Deconstructing Construction - NXT BLD London, June 2019

Image Between the folds - Towards a material revolution - NXT BLD London, June 2019

Image  User Defined Software - NXT BLD London, June 2019

ImageFrom real-time to realism - NXT BLD London, June 2019

Image Re-imagine cities of the future with next gen visualisation - NXT BLD London, June 2019

Image Applications of Mixed Reality in design and construction - NXT BLD London, June 2019

Image Support for standalone VR headset extends reach of team-wide VR collaboration for architecture and design

Image Greg Corke shares his first impressions of HP’s new VR headset which boasts a much higher resolution than others

Image Saif Khan, network manager at KPF, shares his experiences of moving the global architecture firm’s virtual desktop infrastructure (VDI) workload to the cloud

Image A free application from the London Mayor’s office helps developers conform to planning rules and decide which rapid off-site construction technology best fits their design

Image Many AEC firms struggle to fully understand the different options for VDI and whether to go cloud or on-premise. Adam Jull of IMSCAD Global explores the benefits and costs

Image Public sector bodies can now choose Powerproject SaaS, IconSystem and ShireSystem

p>Image London-based practice says project information management solution is applicable to all of its staff

Image Verity Photo enables users to snap photos of a project site, the align them to a coordination model to identify mistakes

Image New technology designed to make it easier for construction workers to feed data into the project’s BIM model

Image Acquisition intended to strengthen the 3D visualisation capabilities of the company’s Geosystems division

Image With MS Project integration, contractors can get their project schedule up and running in seconds says the Australian firm

Image Low-profile Radeon Pro WX 3200 graphics card designed for small form factor workstations

Image Advanced RFIs and Project Hub designed to boost project visibility and extend workflows to site

Image New integration between Leica Captivate / iCON and Autodesk BIM 360 to streamline communication and collaboration

Image Lenovo's new ThinkPad P53 delivers the kind of 3D performance never seen before in a 15.6” mobile workstation